The much needed storm drain being built along Lakewood Avenue is months behind schedule. Despite many inconveniences, closing off parts of Patterson Park, detoured traffic, and damaged to many homes, the residents are determined to carry on

Joan Clark Netherwood, The much needed storm drain being built along Lakewood Avenue is months behind schedule. Despite many inconveniences, closing off parts of Patterson Park, detoured traffic, and damaged to many homes, the residents are determined to carry on, 1978, gelatin silver print, Smithsonian American Art Museum, Transfer from the National Endowment for the Arts, 1983.63.986
Copied Joan Clark Netherwood, The much needed storm drain being built along Lakewood Avenue is months behind schedule. Despite many inconveniences, closing off parts of Patterson Park, detoured traffic, and damaged to many homes, the residents are determined to carry on, 1978, gelatin silver print, image: 7 18 × 7 in. (18.1 × 17.8 cm) sheet: 10 × 7 78 in. (25.4 × 20.0 cm), Smithsonian American Art Museum, Transfer from the National Endowment for the Arts, 1983.63.986

Artwork Details

Title
The much needed storm drain being built along Lakewood Avenue is months behind schedule. Despite many inconveniences, closing off parts of Patterson Park, detoured traffic, and damaged to many homes, the residents are determined to carry on
Date
1978
Location
Not on view
Dimensions
image: 7 18 × 7 in. (18.1 × 17.8 cm) sheet: 10 × 7 78 in. (25.4 × 20.0 cm)
Credit Line
Transfer from the National Endowment for the Arts
Mediums Description
gelatin silver print
Classifications
Keywords
  • Cityscape — Maryland — Baltimore
  • Object — other — wreath
  • Architecture Exterior — detail — fence
  • Architecture Exterior — domestic — row house
  • Architecture Exterior — industry — construction
Object Number
1983.63.986